Everything You Need To Know About Magnetic Closure Boxes Of Foam Lining Plates, Here It Is!

Oct 25, 2022

Leave a message

Everything you need to know about Magnetic Closure Boxes Of Foam Lining plates, here it is!


Operating procedures and precautions for installing plate operating procedures and removing plate operating procedures.


1, installation plate operating procedures


(1) Operation procedure:


(1) Adjust the pressure according to the pressure requirements of the plate, and adjust the cylinder shaft position according to the plate length.


(2) Remove obstacles on the pedestrian passage and on the colored seat, such as ground tools, accessories, ink bucket, ink rod, ink spoon, and adjust the press roller and ink plate to the appropriate position.


(3) the quality inspection confirmed that can be used for production of the plate, according to the color sequence number in the corresponding unit.


(4) Two people work together, each holding one end of the plate to the color seat.


⑤ Send the printing plate to the position of the two ends of the gas axis, the first version of the left end of the hole and the gas axis closed, and then open the right gas valve, so that the right gas axis and the right end of the hole closed.


(2) Precautions:


(1) after the installation of the plate plate drum plate number to have the order, do not disturb the order.


(2) Confirm the printing plate installation direction according to the process sheet requirements. Some enterprises are accustomed to plate installation direction is positive, that is, the plate on the arrow direction and plate to turn the same. But even if the same enterprise with the same live piece, when the customer printing head out, the end of the change, the direction of the plate will also change.


③ When the plug on the gas shaft pushes the end hole of the version, the key pin should be set into the keyway.


Note: IN the process of plate loading, it is strictly prohibited to have plate collision and scratch.


2, remove the printing plate operation procedure


(1) Operation procedure:


(1) Before removing the plate, remove the obstacles (such as tools, accessories, ink drums, etc.) in the pedestrian passage and the plate place.


(2) The printing press is opened at a low speed, the ink plate is put down, the scraper is lifted, and the ink is scraped off the plate layout and the plate end with auxiliary tools.


(3) Use solvent to clean the ink of the plate and the plate, and then stop the plate rotation.


(4) Two people work together, hold the two ends of the plate by hand, change the air valve switch, make the air shaft out of the plate, loosen the other end of the plate, take out the plate, transport to the plate area, plate frame.


⑤ Clean the ink attached to both ends of the plate with solvent, coat all positions on the plate with protective oil, and wrap the plate with corrugated paper inside the film.


(2) Precautions:


(1) When cleaning the plate, the ink in the mesh should be cleaned.


(2) The surface should be wiped to rust oil, and the corrugated paper with the package should be replaced when the moisture is serious.


③ Plate disassembly process should be strictly prohibited collision, do not touch the plate.


(4) When there is a printing plate, plug plate, should stop erasing plate operation. The reasons for the failure are as follows: wet weather, relatively large humidity in the workshop, water infiltration into the ink, causing printing sticky plate, scrape not clean; Caused by raw materials, such as PVC thermal shrinkage film is too dirty, BOPP used additives are not good, easy to stick; Summer workshop temperature is higher, shallow net hanging net easy plug version.


Send Inquiry